There was plenty on the agenda yesterday: Craig was finishing the handrail. Tim was installing deadbolts. Bill and I were determining what lumber was useable and what needed to go. Bill moved rocks (we had no idea there were so many rocks in that seemingly small pile!). I shop vac'd the first floor.
There was a lot of stuff left in the parking area that we needed to move so the semi can get in tomorrow with the equipment. I did not get pictures of this before we started but we got what we needed to cleaned up and still have more to go. Yes, Virginia, we need a dumpster!
Today we are going to be chalking / taping the location for the equipment. Some of it is kind of big and heavy and it would be good if it went directly to its location while we have a forklift on site. Now we are working with the assumption that we know where everything belongs! As Craig would say "Oh Geez".



No comments:
Post a Comment